Archive for October, 2009

Open Rec Area Construction

Thursday, October 15th, 2009

A small portion of the Open Rec Area has been taken for the construction of an emergency exit hallway. This hallway is required per code once the emergency exit at the south end of the Open Rec Area is no longer accessible. The construction of the hallway has eliminated the use of one basketball net.

The Big Hole at the SMC

Thursday, October 15th, 2009

On Monday, contractors began digging the hole that will be the main mechanical room for the building addition. The hole is located on the southeast corner of the existing Open Rec Area. The site should become a little louder over the coming days as workers begin to remove the rock that is in this area.

South Vestibule Demolition

Friday, October 2nd, 2009

The south vestibule at the RMPR building entrance will be demolished on Monday, October 5. Look for pictures of this work to be posted shortly!